Quantcast
Channel: New board topics in SmartBear Community
Viewing all articles
Browse latest Browse all 20990

From Project teardown script can I access the status, timetaken of TestSuite and TestCase?

$
0
0

I'm trying to access from a Project teardown the result of the test execution.

 

Inside this project I have 2 Test Suites. One with 2 testCases and one with 1 testCase

 

Projects.jpg

 

The goal is to build an email with the Project result inside the body (nothing attached)

 

NAME

DETAILS

RESULT

PROJECT

 

FAIL

-TestSuite 1

Response time = 3904 ms

PASS

--TestCase 1

Response time = 1589 ms

PASS

--TestCase 1.1

Response time = 2315 ms

PASS

-TestSuite 2

Response time = 717 ms

FAIL

--TestCase 2

Response time = 717 ms

FAIL

 

I tried runner, context but without success.

 

Can someone help me with it?

 

Thanks,

Rodrigo Petry

 


Viewing all articles
Browse latest Browse all 20990

Trending Articles